1 |
HP-087 |
STRUCTUAL FABRICATION |
OGEI |
SABIC |
ON-GOING |
DAMMAM |
2016 |
2 |
HP-086 |
HDPE LINING WORKS |
AL-ROBAYA |
ARAMCO |
ON-GOING |
UTHALIYYA |
2016 |
3 |
HP-085 |
TELECOM MARKER POST INSTALLATION |
SIDEM |
MARAFIQ |
ON-GOING |
JUBAIL |
2016 |
4 |
HP-084 |
JEDDAH CABLES GENERAL AMC |
NATIONAL GAS,OMAN |
JEDDAH CABLES |
ON-GOING |
JEDDAH |
2016 |
5 |
HP-083 |
NITROGEN PURGING ACTIVITY-AL-MARAI |
NATIONAL GAS,OMAN |
- |
ON-GOING |
JEDDAH |
2016 |
6 |
HP-082 |
SAEED PERFUME GENERAL AMC |
NATIONAL GAS,OMAN |
SAEED PERFUME |
ON-GOING |
JEDDAH |
2016 |
7 |
HP-081 |
ARABSTEEL MAINTENANCE |
NATIONAL GAS,OMAN |
ARAB STEEL |
ON-GOING |
DAMMAM |
2016 |
8 |
HP-080 |
CONTAINER 10 FEET FABRICATION |
AL-MANZURI |
AL-MANZURI |
ON-GOING |
DAMMAM |
2016 |
9 |
HP-079 |
WASTE BIN |
AL-MANZURI |
AL-MANZURI |
ON-GOING |
DAMMAM |
2016 |
10 |
HP-078 |
RUNWAY BEAM
|
AL-MANZURI |
AL-MANZURI |
ON-GOING |
DAMMAM |
2016 |
11 |
HP-077 |
CONTAINER 10 FEET FABRICATION
|
AL-MANZURI |
AL-MANZURI |
ON-GOING |
DAMMAM |
2016 |
12 |
HP-076 |
LPG STORAGE SYSTEM
|
NATIONAL GAS,OMAN |
UNITED FOODS |
ON-GOING |
RIYADH |
2016 |
13 |
HP-075 |
HDPE PIPE REPAIRING
|
SAMSUNG |
SEC |
COMPLETED |
QUARRAYAH |
2016 |
14 |
HP-074 |
STRUCTUAL ERECTION
|
YUSUF TURNERY |
SAMSUNG |
COMPLETED |
QUARRAYAH |
2016 |
15 |
HP-073 |
STRUCTURAL ERECTION
|
YUSUF TURNERY |
SAMSUNG |
COMPLETED |
QUARRAYAH |
2016 |
16 |
HP-072 |
LPG TANK FARM
|
NATIONAL GAS,OMAN |
- |
ON-GOING |
KHARJ |
2016 |
17 |
HP-069 |
LPG STORAGE SYSTEM-PIPING,ELECTRICAL
|
NATIONAL GAS,OMAN |
SAUDI MASTER BAKER |
COMPLETED |
RIYADH |
2016 |
18 |
HP-071 |
RTR PIPE JOINTS LAMINATION WORKS
|
NCC-SAIPEM |
ARAMCO |
ON-GOING |
KHURAIS |
2016 |
19 |
HP-070 |
INSULATION WORKS-PIPES AND TANKS
|
TECHNIP |
KEMYA |
COMPLETED |
JUBAIL |
2016 |
20 |
HP-068 |
NATURAL GAS PIPE LINE INSTALLATION
|
ACICO |
ACICO |
ON-GOING |
JUBAIL |
2016 |
21 |
HP-067 |
RELOCATION OF TEMPERORY FACILITIES
|
ABC |
ARAMCO |
COMPLETED |
JIZAN |
2016 |
22 |
HP-066 |
CIVIL WORKS
|
JOTUN |
JOTUN |
COMPLETED |
DAMMAM |
2016 |
23 |
HP-065 |
CIVIL WORKS-PARKING AREA,SHELTER ETC
|
JOTUN |
JOTUN |
COMPLETED |
DAMMAM |
2016 |
24 |
HP-064 |
HDPE LINING
|
ASAS-KABANI |
MAADEN |
ON-GOING |
TURAIF |
2016 |
25 |
HP-063 |
CIVIL WORKS
|
GATES ENGINEERING |
GATES ENGINEERING |
COMPLETED |
DAMMAM |
2016 |
26 |
HP-062 |
CIVIL WORKS
|
GATES ENGINEERING |
GATES ENGINEERING |
COMPLETED |
DAMMAM |
2016 |
27 |
HP-060 |
AL-MARAI MAINTENANCE WORKS
|
NATIONAL GAS,OMAN |
- |
COMPLETED |
KHARJ |
2016 |
28 |
HP-059 |
LPG GAS LINE MAINTENANCE
|
NATIONAL GAS,OMAN |
SAUDI MASTER BAKER |
COMPLETED |
RIYADH |
2016 |
29 |
HP-061 |
FABRICATION WORKS-PAD EYES
|
AL-MANZURI |
AL-MANZURI |
COMPLETED |
DAMMAM |
2016 |
30 |
HP-058 |
INSULATION WORKS-PIPE LINE
|
DOOSAN |
SEC |
ON-GOING |
QUARRAYAH |
2016 |
31 |
HP-057 |
PVDF PIPING WORKS
|
ASAS-NSH |
SADARA |
COMPLETED |
JUBAIL |
2016 |
32 |
HP-056 |
FABRICATION OF HANDRAILS
|
AL-MANZURI |
AL-MANZURI |
COMPLETED |
DAMMAM |
2016 |
33 |
HP-055 |
FABRICATION OF PLATE PAD
|
AL-MANZURI |
AL-MANZURI |
COMPLETED |
DAMMAM |
2016 |
34 |
HP-054 |
CONSTRUCTION OF WAREHOUSE
|
AL-MANZURI |
AL-MANZURI |
COMPLETED |
DAMMAM |
2016 |
35 |
HP-044 |
HDPE LINING
|
SJ GROUP |
UNITED-SABIC |
ON-GOING |
JUBAIL |
2015 |
36 |
HP-053 |
HDPE TANK REPAIRING
|
FLUOR ARABIA |
SADARA |
COMPLETED |
JUBAIL |
2015 |
37 |
HP-052 |
PIPING FABRICATION AND ERECTION WORKS
|
ISISAN |
ISISAN |
COMPLETED |
YANBU |
2015 |
38 |
HP-051 |
HDPE TANK REPAIRING
|
SCHEM |
SCHEM |
COMPLETED |
JUBAIL |
2015 |
39 |
HP-050 |
FRP PIPE REPAIRING WORKS
|
SCHEM |
SCHEM |
COMPLETED |
JUBAIL |
2015 |
40 |
HP-049 |
PP TANK LINING
|
NALCO |
NALCO |
COMPLETED |
DAMMAM |
2015 |
41 |
HP-048 |
LPG STORAGE SYSTEM-PIPING,ELECTRICAL
|
NATIONAL GAS,OMAN |
QARYAN STEEL |
COMPLETED |
DAMMAM |
2015 |
42 |
HP-047 |
HDPE PIPELINE INSTALLATION
|
ALI SALAM COMPANY |
COMMUNITY COLLEGE |
COMPLETED |
DAMMAM |
2015 |
43 |
HP-046 |
INSULATION WORKS-PIPE LINE
|
DOOSAN |
SEC |
COMPLETED |
QUARRAYAH |
2015 |
44 |
HP-045 |
INSULATION WORKS-PIPES AND TANKS
|
SIDEM |
SADARA |
COMPLETED |
JUBAIL |
2015 |
45 |
HP-043 |
CIVIL WORKS
|
SJ GROUP |
UNITED-SABIC |
COMPLETED |
JUBAIL |
2015 |
46 |
HP-042 |
HDPE,PVDF PIPING INSTALLATION
|
SIDEM |
SADARA |
COMPLETED |
JUBAIL |
2015 |
47 |
HP-041 |
FABRICATION AND INSTALLATION OF STAINLESS STEEL
|
SIDEM |
SADARA |
COMPLETED |
JUBAIL |
2015 |
48 |
HP-040 |
FABRICATION OF HDPE COUPLINGS
|
SIDEM |
SADARA |
COMPLETED |
JUBAIL |
2015 |
49 |
HP-039 |
FRP/RTR LAMINATION
|
NCC-DAELIM |
KEMYA |
COMPLETED |
JUBAIL |
2014 |
50 |
HP-038 |
PLASTIC PIPING WORKS-PVDF
|
ASAS-NSH |
SAFCO |
COMPLETED |
JUBAIL |
2014 |
51 |
HP-037 |
HDPE SPOOL FABRICATIONS
|
TEKFEN |
SADARA |
COMPLETED |
JUBAIL |
2014 |
52 |
HP-036 |
CIVIL WORKS-FOUNDATIONS,ASPHALTING
|
SAHARIGLOBAL |
WETHERFORD |
COMPLETED |
UTHMANIA |
2014 |
53 |
HP-035 |
LPG STORAGE SYSTEM
|
NATIONAL GAS,OMAN |
SAUDI CERAMIC |
COMPLETED |
RIYADH |
2014 |
54 |
HP-034 |
SUPPLY AND INSTALLATION OF SCAFFOLDING
|
CHEC |
DAMMAM PORT |
COMPLETED |
DAMMAM |
2014 |
55 |
HP-033 |
CIVIL AND MECHANICAL WORKS
|
JOTUN |
JOTUN |
COMPLETED |
DAMMAM |
2014 |
56 |
HP-032 |
PREPARATION OF FINAL AS-BUILT DRAWINGS
|
ABB |
SEC |
COMPLETED |
DAMMAM |
2014 |
57 |
HP-031 |
CIVIL WORKS
|
NOOR CARTONS |
NOOR CARTONS |
COMPLETED |
DAMMAM |
2014 |
58 |
HP-030 |
ELECTRICAL AND PIPING WORKS
|
JOTUN |
JOTUN |
COMPLETED |
DAMMAM |
2014 |
59 |
HP-029 |
LPG STORAGE SYSTEM-PIPING,ELECTRICAL
|
NATIONAL GAS,OMAN |
PEPSICO |
COMPLETED |
DAMMAM |
2014 |
60 |
HP-028 |
COMPLETE PIPELINE ERECTION SS,CS ETC.
|
YSFT-ASRY OFFSHORE |
AXEN CATYLYST |
COMPLETED |
DAMMAM |
2014 |
61 |
HP-027 |
WATER PROOFING WORKS
|
CHINA HARBOUR |
AECOM |
COMPLETED |
DAMMAM |
2014 |
62 |
HP-026 |
GRP-FRP RTR LAMINATION/PLASTIC PIPING |
SAMSUNG |
SEC |
COMPLETED |
QUARRAYAH |
2014 |
63 |
HP-025 |
PP PLASTIC PIPE LINE WORKS
|
ASAS-AMACO |
HADEED-SABIC |
COMPLETED |
JUBAIL |
2014 |
64 |
HP-024 |
SUPPLY AND INSTALLATION OF PARARAPT CAP |
BONATTI |
YASREF |
COMPLETED |
YANBU |
2013 |
65 |
HP-023 |
LPG STORAGE SYSTEM-PIPING,ELECTRICAL
|
NATIONAL GAS,OMAN |
FGOC |
COMPLETED |
YANBU |
2013 |
66 |
HP-022 |
FENCE INSTALLATION |
BONATTI |
YASREF |
COMPLETED |
YANBU |
2013 |
67 |
HP-021 |
CIVIL WORKS FOR WWT BASIN
|
BONATTI |
YASREF |
COMPLETED |
YANBU |
2013 |
68 |
HP-020 |
CIVIL WORKS-MANHOLE,CATCHBASIN,VALVE BOX |
BONATTI |
YASREF |
COMPLETED |
YANBU |
2012 |
69 |
HP-019 |
INSTRUMENTATION WORKS |
ISE |
PETRO KEMYA |
COMPLETED |
JUBAIL |
2012 |
70 |
HP-018 |
SUPPLY AND INSTALLATION OF COMPLETE CIVIL WORKS |
YESKAY |
ARAMCO |
COMPLETED |
JUBAIL |
2012 |
71 |
HP-017 |
CIVIL WORKS-CLEAN OUT CHAMBER |
INDIPCO |
INDIPCO |
COMPLETED |
JUBAIL |
2012 |
72 |
HP-015 |
CIVIL,ELECTRICAL AND MECHANICAL WORKS |
ICS |
ARCELOR MITTAL |
COMPLETED |
JUBAIL |
2012 |
73 |
HP-016 |
CIVIL CONCRETE WORKS |
APCO |
APCO |
COMPLETED |
JUBAIL |
2012 |
74 |
HP-014 |
ELECTRICAL WORKS |
SAUDI MASTER BREAKER |
SAUDI MASTER BREAKER |
COMPLETED |
DAMMAM |
2012 |
75 |
HP-013 |
FABRICATION OF CANOPY |
ICS |
SAFCO |
COMPLETED |
JUBAIL |
2012 |
76 |
HP-012 |
ELECTRICAL ENGINEERING AND DESIGN SERVICES |
SATECH |
ABB |
COMPLETED |
KHOBAR |
2012 |
77 |
HP-011 |
ELECTRICAL WORKS |
MMR |
ETISALAT |
COMPLETED |
DAMMAM |
2012 |
78 |
HP-010 |
ELECTRICAL WORKS |
ABB |
SEC |
COMPLETED |
DAMMAM |
2012 |
79 |
HP-009 |
FIRE PROOFING WORKS-SALES GAS FILTERATION SYSTEM |
ROBAYA |
ARAMCO |
COMPLETED |
YANBU |
2011 |
80 |
HP-008 |
CIVIL WORKS |
AL-JABRIA |
AL-JABRIA |
COMPLETED |
DAMMAM |
2011 |
81 |
HP-007 |
SUPPLY AND INSTALLATION FIRE RATED GYPSUM WALL |
ROBAYA |
ARAMCO |
COMPLETED |
SHEDGUM |
2011 |
82 |
HP-006 |
INSTALLATION OF FM200 AND DETECTION SYSTEM |
MMR |
MOBILY |
COMPLETED |
DAMMAM |
2011 |
83 |
HP-005 |
ERECTION OF WARE HOUSE |
DAELIM |
SAUDI KAYAN |
COMPLETED |
JUBAIL |
2010 |
84 |
HP-004 |
CIVIL WORKS |
ASWAR AL-KHALEEJ |
KEMYA |
COMPLETED |
JUBAIL |
2010 |
85 |
HP-003 |
CIVIL WORKS |
ICS |
SAFCO |
COMPLETED |
JUBAIL |
2010 |
86 |
HP-002 |
CIVIL WORKS-BUILDING LAUNDRY SHOP |
MOVENPICK |
MOVENPICK |
COMPLETED |
DAMMAM |
2009 |
87 |
HP-001 |
AIRPORT LIGHTENING ELECTRICAL WORKS |
ICS |
ARAMCO |
COMPLETED |
WAJJ |
2009 |